Riser 2 Times Higher

Objective

The simulation of 2 times longer of pipeline gives us an understanding of the influence of pipeline length on the appearance of severe slugging, so now we move to testing the effect of riser length.

We keep all of the characteristics of the pipeline-riser system and just change the geometry of the riser with 2 times longer as shown in the figure below.

 

We continue to take the same manipulation as the base case:

1. Drawing 3 turndown curve

2. Estimate the transition point in each turndown curve

3. Drawing the flow map